Yesterday's walkthrough in 3 short videos. As drywall is going up today, the place looks much different. It's crazy to see. So before it's all covered up, here's the last look at the rough-in utilities, truly behind the scenes.
1. From the front door through the retail area. The drop ceiling is where the butcher counter, deli counter, and POS is located. You'll see butcher blocks and coolers for dry aging just behind the counter. Cut to order.
2. This is the ductwork for the HVAC and for the hood. These ducts will be hidden above drop ceiling. A ton of welding and custom work went into these. And the video goes into the kitchen where you can see the kitchen.
3. Finally the view from way back showing the dish pit, the bathroom and the giant muffler hanging off the back of the building.
This project is wild. I can't believe it's finally coming together. So much more to do in so little time.
#5151ButlerStreet#butlerst#lawrenceville#pittsburgh#butchersofinstagram#butcher